Day one:
Painstakingly installed the 8 foot bar along the top and began to grid out my pictures.
Day two:
Nailed all of the pictures fully, hung the strings from eyelets, and applied the weights.
Day three:



I fixed all of the labels to the weights, installed vinyl, and painted the beam at the top.
No comments:
Post a Comment